Cortina Sliding Centre “Eugenio Monti” – Milano Cortina 2026

Cortina d’Ampezzo | 2025 | Completed

Project Overview

  • Site name: Bobsleigh track for the 2026 Milan-Cortina Winter Olympics
  • Location: Cortina d’Ampezzo
  • Start date: 2025
  • LMV scope: Design and construction of structural steel elements

LMV is a key contributor to the construction of the Cortina bobsleigh track, a strategic Olympic infrastructure for the Milano Cortina 2026 Winter Olympic Games.

Contributing to a project of global significance represents both a responsibility and a strong motivation for LMV to guarantee the highest quality standards at every stage.

The Cortina bobsleigh track is a highly complex structure requiring exceptional precision from engineering design through to on-site execution.

LMV for the Cortina Bobsleigh Track Project

Within the project, LMV is responsible for:

  • Structural design and engineering
  • Fabrication of structural steel components and pipework
  • On-site construction and erection

 

The scale and complexity of the project demonstrate LMV’s capability to manage technically demanding works and large volumes of specialised steel fabrication.

The Bobsleigh Track Project in Figures

The complexity of the project and the substantial quantity of material used clearly demonstrate LMV’s capability to manage large volumes and technically demanding fabrication works.

  • Steel used: 2,050 tonnes
  • Perforated steel: 3,200 m²
  • Piping installed: 83 km