Project Overview
- Site Name: Cable-stayed suspension bridge over the Oglio River
- Location: Brescia
- Start Date: 2025
- LMV Scope: Design and construction of a suspended steel bridge
LMV is involved in the construction of a major infrastructure project for the Province of Brescia: a 236-metre-long suspended steel bridge.
The bridge represents a strategic asset for the Brescia region, designed to optimise traffic flow and ensure safer and more efficient connectivity.
The choice of a suspended structural solution is driven by its ability to span long distances with a reduced number of supports, offering significant advantages from both structural and environmental perspectives.
The construction of the bridge therefore requires exceptional execution accuracy, as well as meticulous management and coordination of site activities.
The new structure will be built alongside the existing bridge, which will be demolished once traffic is fully transferred to the new crossing.
LMV for the Brescia Suspended Bridge Project
For this project, LMV provides a comprehensive service including:
- Structural engineering design
- Fabrication of structural steelwork
- Supply of steel components
- On-site construction and erection, using the launching method for the assembly and installation of the structure
The adoption of this launching methodology optimises erection operations, minimises the impact on the surrounding environment and ensures high safety standards.




