Construction of an industrial building for the transformation of food products with a size of 4,000 square meters. Annex building with offices (250 square meters, 2 floors, total weight 450 tons).
LMV World supervised the planning, performed the construction of galvanized steel structures and carried out the installation of curtain walling. The yard lasted 6 months.