Lamborghini Warehouse

Lamborghini Warehouse
  • Sant'Agata Bolognese, Bologna, Italy
  • 2016 / Complete
  • 1400 tons

Client: Automobili Lamborghini Spa
Steel weight: 1400 tons

LMV World has worked on the expansion of the Automobili Lamborghini Spa plant. The project is part of the development plan of the company that has seen the doubling of its production site.

Two areas were affected by the intervention: the assembly line shed (BUILDING ZP7 ASSEMBLY) and the one destined for the finishing line (BUILDING ZP8 FINISHING).

BUILDING ZP7 ASSEMBLY - Expansion works were carried out on the assembly line construction, consisting of a reinforced concrete overhead structure and covered with prefabricated cover plate and corrugated steel sheet. In some areas of the industrial building, there are internal mezzanines in prefabricated concrete elements and metal structures. The external covering has been realized with “sandwich” panels, polycarbonate frames and sectional door.

BUILDING ZP8 FINISHING - The area dedicated to the finishing line has been realized in mixed reinforced concrete structures and iron frames with corrugated sheet roofing. The building stands on three floors above ground: Ground Floor, First Floor and Cover with only one area accessible via the stairwell. The structure is externally covered with “sandwich” panels, aluminium frames and sectional doors.

The total supply of carpentry was 1400 tons.

The following companies - part of LMV World - participate in the project:
- LMV Spa, supply and supervision for assembly.
- INGECOM Strutture, development of project drawings.

Watch the video from the opening of the sheds below.

 

 Ingecom Strutture

supervising  LMV S.p.A.

Media

Watch the video that presents the expansion of Lamborghini plant. 80,000 square meters. 3,600 workers.…