Realization time: 8 months
Total roof covered area: 20 000 mq
Construction of an industrial building of 15,000 m2 for the rolling mill with three bays (25 m x 200 m, H = 15 m) and guides for the 60 t crane. Since the building is designed for rolling operations, the particularity is in the construction of its structures: the beams (2 m x 15 m) and the welded guides with full penetration.
LMV World has participated with: design, production of galvanized metal structures, painting, delivery and assembly on site, finishing work.