Client: Unicredit Leasing S.p.A.
Time of realization: 6 months.
Construction of an industrial building of 18,000 m2, consisting of 4 spans of 20x220 m with a height of 14 m, including tracks for 20-tonne overhead cranes, for a total of 1700 tonnes of metal.
Construction of an annexed office building of a total functional square of 1200 m2.
LMV World supplied: production of painted metal structures, delivery and assembly.