Construction of an industrial building of 18,000 m2 for the rolling mill with three bays (25 m x 200 m, H = 15 m) and guides for the 60 t crane.
The building is designed for rolling operations and its particularity is in the construction of its structures: the beams (2.5 - 3 x 14 - 28 m) and the welded guides with full penetration.