Was carried out the second launch of Left Way in SECTION 9B – SAVUSHKINA, composed by the entire launching nose of 72,00 m long and 110 tons in weight, and two connector elements of the main frame.
Matteo Pachera
Project Manager of Savushkina Construction Site WHSD
LMV Russia
VCS Montazh